PROJECT: THE ECOLOGICAL STATUS OF THE BISTRICA - DYNAMICS OF REALISATION
| N0 | ACTIVITY | REALISATION TIME (IN MONTHS) |
|||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||
| 1. | PROJECT THE ECOLOGICAL STATUS OF THE BISTRICA - PROJECT BASIS | . | . | . | . | . | . | . | . | . | . | . | . |
| 2. | THE STUDY - RESEARCH PROGRAM | . | . | . | . | . | . | . | . | . | . | . | . |
| 2.1. | OUTLINE OF THE AVAILABLE TECHNICAL DOCUMENTATION | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.2. | GEOGRAPHIC ASPECT | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.3. | HYDROGRAPHIC ASPECT | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.4. | HYDROLOGY ASPECT | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.5. | GEOLOGY - PEDOLOGY ASPECT | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.6. | ECOLOGY ASPECT | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.7. | LIST OF POLUTANTS | X | X | X | X | . | . | . | . | . | . | . | . |
| 2.8. | CATTLE BREEDING AS ASN INDUSTRIAL BRANCH | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.9. | SLAUGHTERHOUSES (MEAT - PACKING INDUSTRY) | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.10. | SEWAGE WASTE WATERS | X | X | X | . | . | . | . | . | . | . | . | . |
| 2.11. | DEPOSITS OF SOLID WASTE MATERIALS | X | X | X | . | . | . | . | . | . | . | . | . |
| 3. | ASSESSMENT OF THE QUALITY OF THE BISTRICA WATER | X | X | X | X | X | . | . | . | . | . | . | . |
| 4. | PROPOSAL OF MEASURES | . | X | X | X | X | X | X | . | . | . | . | . |
| 4.1. | ELIMINATION OF POLLUTION SOURCES | . | X | X | X | X | X | . | . | . | . | . | . |
| 4.2. | BUILDING OF THE WASTE WATER TREATMENT PLANTS FOR INDUSTRIAL, SLAUGHTERHOUSE AND FARM WASTE WATERS | . | X | X | X | X | X | . | . | . | . | . | . |
| 4.3. | BUILDING OF THE WASTE WATER TREATMENT PLANTS FOR SEWAGE WATERS | . | X | X | X | X | X | . | . | . | . | . | . |
| 4.4. | PROTECTION MEASURES IN INDIVIDUAL SOURCES OF POLLUTION AND AGAINST FLOODS | . | X | X | X | X | X | . | . | . | . | . | . |
| 4.5. | BUILDING OF ANTI - FLOOD SYSTEMS | . | X | X | X | X | X | . | . | . | . | . | . |
| 4.6. | AFFORESTATION | . | X | X | X | X | X | . | . | . | . | . | . |
| 4.7. | REGULATION OF THE RIVER THROUGH SETTLEMENTS | . | X | X | X | X | X | . | . | . | . | . | . |
| 5. | PROTECTION MEASURES AGAINST SOLID WASTE MATERIALS | . | . | . | X | X | X | X | X | . | . | . | . |
| 5.1. | REMOVAL OF UNCONTROLLED WASTE DEPOSITS | . | . | . | X | X | X | X | . | . | . | . | . |
| 5.2. | LAW REGULATION OF SITING AND MAINTENANCE OF WASTE DEPOSITS | . | . | . | X | X | X | X | X | . | . | . | . |
| 5.3. | RECULTIVATION OF THE SOIL AFTER DEPOSITS HAVE BEEN REMOVED, PREVENTION OF FURTHER POLLUTION OF THE BISTRICA BY FILTERING THE REMAINS OF THE WASTE | . | . | . | X | X | X | X | X | X | . | . | . |
| 5.4. | PROPOSAL FOR PROCESSING OF THE POSSIBLE INDUSTRIAL WASTE AND DANGEROUS WASTE | . | . | . | X | X | X | X | X | X | . | . | . |
| 6. | PROPOSAL FOR PROTECTION PROGRAM OF THE BISTRICA BASIN | . | . | . | . | X | X | X | X | X | X | X | . |
| 6.1. | EXTENT AND TYPE OF PROTECTION | . | . | . | . | X | X | X | X | X | X | X | . |
| 6.2. | OVERALL MEASURES | . | . | . | . | X | X | X | X | X | X | X | . |
| 6.3. | ADMINISTRATION MEASURES | . | . | . | . | X | X | X | X | X | X | X | . |
| 6.4. | EDUCATION MEASURES | . | . | . | . | X | X | X | X | X | X | X | . |
| 7. | PROPOSAL FOR THE CARRYING OUT OF THE GLOBAL URBAN PLAN OF SERBIA FOR THIS REGION (FOCUSING ON THE BISTRICA RIVER BASIN) | . | . | . | . | . | . | . | . | X | X | X | X |